German strawberry grower Hof Gerbert has completed a two-phase installation of 2 hectares of elevated growing gutters beneath foil tunnels at its farm in Telgte-Westbevern. The first hectare was finished in 2025 and the second in 2026, according to original reporting by HortiDaily on 17 November based on an interview with Dutch growing-system supplier Growtec. The two-hectare total should not be mistaken for two hectares completed this year alone.
The family business grows strawberries as well as asparagus and other soft fruit. Its strawberries are produced under foil tunnels and in open fields, with sales through the farm shop, a vending machine and regional retailers. For this latest phase, the investment puts more of its crop on elevated gutters under protective film.
Two installation phases, one growing-system supplier
Growtec and German installation partner Ralf Steves supplied the cultivation system for Hof Gerbert. Their work included posts and post installation, growing gutters, the associated components and irrigation. The reported scope concerns crop-support and watering infrastructure beneath foil tunnels, not a new glasshouse or an announced expansion beyond the stated two hectares.
Robin Dirks of Growtec told HortiDaily that elevated gutters and covered growing conditions can make crop work more accessible and help protect strawberry production against weather exposure. The tunnels also aim to create a warmer microclimate for earlier local harvesting. These are the stated operational reasons for the configuration, not independently measured improvements specific to this farm.
Why the completed expansion matters
For protected-crop suppliers, the completed second phase shows a commercial strawberry producer continuing investment in elevated production systems after its initial one-hectare installation. For growers assessing similar projects, the relevant variables include installation cost, labour requirements, plant performance and the value of earlier seasonal market access.
The available interview does not quantify yield gains, kilograms per square metre, crop-price premiums, labour savings or return on investment. Nor does it establish the specific completion month in 2026. Further performance information from the farm would be needed to assess the commercial results of the system rather than its installed scale alone.
Key takeaways
- Hof Gerbert’s two hectares were installed in two phases: one hectare in 2025 and another in 2026.
- Growtec and Ralf Steves supplied the posts, raised gutters and irrigation beneath foil tunnels.
- The installation is confirmed; quantitative yield, labour and financial outcomes have not been reported.
Featured photograph: a real Growtec-branded elevated strawberry growing system shown by supplier partner Rovero. This illustrative photograph is from another installation; it does not depict Hof Gerbert’s farm. Photo: Rovero / Growtec.