Authorities in Huangzhong district, Xining, have made public four greenhouse and protected-vegetable production implementation plans with combined budgets of approximately CNY58.46 million. The district agriculture bureau’s 19 October 2026 notice opens the plans and their approvals to public inspection until 30 October; it does not establish that all the physical works have been completed.
The programme combines new tunnel houses, greenhouse insulation upgrades, deep-winter growing facilities and water infrastructure. Its component budgets add up to CNY58.459 million, according to the four itemised implementation documents.
220 new plastic tunnels and more than 180 solar-house equivalents
The Lanlongkou programme has a CNY7.09 million budget for 220 prefabricated plastic tunnels across Banzhongying, Xicha, Bada and Shangzhuang villages. The proposed package includes mobile water-and-fertiliser irrigation equipment and automatic crop-protection sprayers. Its implementation period runs from August 2026 to August 2027.
The largest component, budgeted at CNY37.73 million, would upgrade at least 180 standard-house equivalents of solar greenhouses across five villages, covering about 179,463 square metres of building area. The specifications include insulation and assembled greenhouse structures, alongside drip-irrigation and fertigation improvements. This is a programme of work described in the plans, not a count of newly opened production facilities.
Additional winter houses and drainage upgrades
A CNY8.40 million second-phase agricultural park scheme at Liushuzhuang proposes rebuilding 13 all-season greenhouses and upgrading around 1,714 metres of drainage channels. Separately, the CNY5.24 million He’erying vegetable-base project envisages five large-span deep-winter greenhouses, refurbishment of 15 existing houses, insulation materials and water/drainage infrastructure.
The plans describe implementation windows extending into June or August 2027. Published project budgets and implementation approvals are useful indicators of demand for greenhouse structures, thermal protection, irrigation and installation services, but do not identify the winners of every construction or equipment contract. Construction and performance milestones should be checked against subsequent procurement and completion records.
One of the villages included in the larger solar-house programme is Yula. A previously reported local procurement for a smaller Yula component falls within that broader scheme and should not be counted as an additional fifth programme.
Key takeaways
- Four Huangzhong protected-cropping implementation schemes have combined budgets of CNY58.459 million.
- The plans include 220 new plastic tunnels, over 180 solar-greenhouse standard-unit upgrades, and separate winter-house and drainage works.
- The October notice publicises plans and approvals; project spending, contract awards and physical completion need separate verification.